← All services

Construction Quantity Takeoff

We prepare material and equipment quantity takeoffs and cost estimates for buildings with timber, steel, or reinforced concrete structures. Applications include houses, apartment buildings, public buildings, and high-rise buildings.

Construction Quantity Takeoff

Service Overview

01

Input

Approved architectural and structural drawings for construction permits along with client-specific estimation templates.

02

Scope

Calculate quantities using specialized software or manual entry into custom templates, perform error checks, and export calculation illustration drawings.

03

Implementation

Perform accurate material and equipment quantity take-offs on specialized industry software, cross-check figures, and create calculation illustration drawings.

04

Delivery

Complete material take-off files and calculation verification files. Reached a scale of 2,200 units, 43,000 tsubo per month with a 99% on-time delivery rate.

In-Depth Implementation Capabilities and Solutions

We prepare material and equipment quantity takeoffs and cost estimates for buildings with timber, steel, or reinforced concrete structures. Applications include houses, apartment buildings, public buildings, and high-rise buildings.

Using specialized software or manual calculations, we prepare results in the client’s required format, check the figures for errors, and provide supporting drawings. All figures undergo thorough error inspection accompanied by clear illustration drawings prior to delivery. As of April 2026, our processing capacity has reached 2,200 units, equivalent to 43,000 tsubo per month, maintaining a 99% on-time delivery rate.

Technical Specifications

Execution Scope: Construction material and equipment estimation.

Calculation Methods: Using specialized software or manual calculation entered into client templates.

Deliverables: Material quantity reports, supporting calculations, and drawings illustrating the results.

Execution Scale: Reached 2,200 units, 43,000 tsubo per month as of April 2026.

Schedule Commitment: 99% on-time delivery as required.

Ready to partner
on your project

Share your requirements, workload or current process
Son Thanh team will work with you to identify
the most suitable delivery approach.